Integrated Construction Project of Yangzhou East Railway Station Comprehensive Transportation Hub

Construction Site of Yangzhou East Railway Station Section, Jiangsu
This project is the underground TRD water-stop curtain diaphragm wall works (Phase I) before foundation pit excavation. The total volume of TRD water-stop curtain required for the project is approximately 46,700 m³, with a total length of about 1,630 meters. The construction requirements are as follows: wall thickness of 700 mm, average wall depth of 41 m, wall verticality not greater than 1/300, wall position deviation not exceeding 50 mm, wall thickness deviation not exceeding 20 mm, and no negative deviation allowed in wall depth and wall thickness.
As a national key project, it imposes high standards and strict requirements on construction. To ensure smooth construction progress, the project owner has deployed multiple TRD construction machines and grouting stations in full accordance with the geological conditions.
Case

Global Marine & Overseas Infrastructure: Mexico (2020) & Malaysia Shipyard

  • Projects:Pier reinforcement at Mexico Ensenada Port (2020) and foundation stabilization for a Heavy Shipyard in Malaysia.
  • The Challenge:Extreme heat, high humidity, and salt spray corrosion in remote coastal sites requiring zero-downtime reliability.
  • EIZOO Solution:
    • Marine Protection: Units equipped with field-proven, heavy-duty anti-corrosion coatings to resist severe salt spray degradation.
    • Technical Support: Dispatched senior engineering specialists on-site for cross-ocean mobilization, commissioning, and operator training.
  • The Result:Zero downtime recorded throughout the project cycles. Proven field durability and dedicated technical support across the Pacific and Southeast Asia.
Case

Hong Kong International Airport 3rd Runway (HKIA 3RS)

  • Project Overview:Massive offshore Deep Cement Mixing (DCM) reclamation for the airport expansion.
  • Technical Challenge:High-intensity, 24/7 continuous slurry supply in an extreme marine environment with high salinity and humidity.
  • EIZOO Solution:Deployed the AGP-M (Marine) Series, delivering a massive 40 m³/h throughput to match large-scale offshore DCM barges.
  • Key Achievement: High-Throughput Reliability.Sustained 24/7 operations with zero rig downtime, proving the superior durability of EIZOO’s heavy-duty transmission systems in harsh maritime conditions.
Case

Lok Ma Chau Loop Development (LMC Loop)

  • Project Overview:Precision soil stabilization and foundation reinforcement in an eco-sensitive border zone.
  • Technical Challenge:100% construction data traceability. The project demanded strict adherence to the RSS (Real-time System for Site Management) digital audit.
  • EIZOO Solution:Integrated Smart PLC Monitoring with encrypted data logging, allowing real-time generation of tamper-proof grouting reports.
  • Key Achievement: 100% Digital Compliance.Fully compliant with Hong Kong CEDD and RSS audit standards, ensuring total transparency, environmental safety, and structural integrity.
Case

Hong Kong-Zhuhai-Macao Bridge (HZMB)

  • Project Overview: Foundation reinforcement for the HK Section Artificial Island in 2015.

  • Technical Challenge: Overcoming extreme marine salt spray corrosion and meeting stringent requirements for grout strength and data integrity in deep-sea strata.

  • EIZOO Solution:

    • Physical Activation: Utilized proprietary high-intensity shear activation technology to ensure full hydration and maximum compressive strength of the grout.
    • Heavy-Duty Protection: Engineered with a field-proven marine coating system to withstand intense corrosive salt spray on-site.
    • Smart Control: Equipped with EIZOO’s proprietary computerized control system, enabling encrypted data logging and secure report export functionality—delivering automated, audit-ready site compliance long before modern regulatory mandates.
  • Key Achievement: Proven field reliability. The units ensured stable operations throughout the complex construction cycle, with digital records successfully meeting high-standard management audits, setting an early operational benchmark for digital grouting.